Ramzan
Steel Works

Workshop & business documents

Machine Utilisation And Downtime Tracker

This tracker records, for each machine and day, the hours available, the hours it actually ran and the downtime with its main reason. It gives utilisation and availability for each record, overall utilisation, and the biggest cause of downtime across the log.

  • Free, no sign-up
  • Runs in your browser
  • Built for Islamabad & Rawalpindi

This free calculator runs in your browser and needs JavaScript. If it does not load, call or WhatsApp us on +92 304 2435577 and we will do the calculation for you.

Most workshop machines run far less than people think. Knowing whether the loss is power cuts, waiting for material or no operator points to the right fix, a generator, better ordering or another worker.

What This Tool Does

It totals downtime by reason and highlights machines used less than half the time.

Who It Is For

  • Workshop owners.
  • Supervisors.
  • Anyone deciding whether to buy another machine.

How To Use It

  1. Add a record per machine per day.
  2. Choose the main downtime reason.
  3. Review the summary weekly.

How The Calculation Works

Utilisation = running hours ÷ available hours. Availability = (available − downtime) ÷ available.

Worked Example

Two machines on one day.

Input or result Value
Overall utilisation 30.6%
Biggest loss load-shedding, 2 hours

A generator would recover the most time.

Features And Benefits

  • Downtime by reason.
  • Low-use flags.
  • Evidence for investment decisions.

Assumptions And Accuracy Limits

  • Depends on honest daily entries.
  • Records stay in your browser on your device; nothing is uploaded. Download a backup regularly.

Common Mistakes To Avoid

  • Counting idle as running.
  • No reason recorded.
  • Buying machines to fix waiting time. Fix the cause first.

Load-Shedding And Productivity In Islamabad And Rawalpindi

Power cuts are a real cause of downtime for workshops in the twin cities. Recording them shows whether a generator or solar backup pays for itself.

Frequently Asked Questions

How is machine utilisation calculated?

Running hours divided by available hours.

What is a good utilisation?

It varies; in jobbing workshops welding machines often run well under half the day.

What is availability?

The share of planned time the machine was able to run.